Finishing up the Crown Molding. Really brings the room together.

1/11/08 Tiles about 1/2 done. Should be finished by the end of next week.

More tile up the hallway, along wth the dining room on the left.

Almost finished kitchen. Top Granite bar will be installed tomorrow 1/12/08. Plumbing finished, dishwasher,
trash compactor and tile all done by Tuesday I hope.

Floor and seat in the shower. Took 3 weeks to tile this. A gizilion pieces not counting the floor.

The finally finished kitchen after many Direct Buy screw -ups on the cabinets.

The entryway through which we expect lots of visitors, HINT HINT. Also the doors to the office area
and more tile work.

The washer and dryer. I forgot to take out the shipping bolts and played hell getting it to balance. Thre is
something to be said about "IF ALL ELSE FAILS" read the instructions.
|